Majestic Mailbox Kit with Planter Box
General Information
Important Safety Notes:
- Check the inside of the larger pieces in your box for other materials packed inside.
- When assembling components, place on a non-abrasive surface (i.e. shipping box) to avoid scratching.
- We recommend an area approximately 5' x 8' for unobstructed assembling.
- You should not need to use excessive force when assembling components.
Returns:
If you wish to return your product, please contact us first — we can often help resolve the issue right away.
If a return is still necessary, it must be initiated with the retailer where the product was purchased.
Need Help or Replacement Parts?
If you need replacement parts, assembly assistance, or have questions about the product, our customer service team is ready to help:
- Website: https://parts.nychbrands.com
- Email: support@zippity-outdoor.com
- Phone: 704-892-5222 or 877-234-6196
Customer service agents are available 9am–5pm EST, Monday–Friday.
For Quick Assistance:
- Have reference item number ZP19027
- Provide the specific part name
- Include the batch lot number found on the end of the box
Product Specifications & Dimensions
Recommended Tools
Power Drill with 9/32 Hex Shank Bit
5-10 lb Sledgehammer or Mallet
Scrap 2x4 Wood Block or similar
Level
Lay Out Materials
A — Post Cap (5)
B — Post (1)
3" x 3" x 54"
C — Post Arm (1)
4" x 4" x 23"
D — Rear Board Wall (2)
⅞" x 11" x 6½"
E — Side Board Wall (2)
⅞" x 11" x 14"
F — Front Board Wall (1)
⅞" x 11" x 14"
G — Planter Box Post (4)
3" x 3" x 12¼"
H — Planter Box Brace (1)
⅞" x 1½" x 14¾"
I — Pipe Anchor (1)
⅞" Diameter x 36⅝"
J — ⅝" Tek Screw (2)
K — 3" Self-Drilling Stainless Steel Screw (4)
L — ⅛" Hardened Steel Bit (1)
Step 1
- Plan your install location and check for underground obstructions.
- Mailbox post can be assembled before installing the pipe anchor if desired (skip to Step 6).
Step 2
- Drive Pipe Anchor (I) into the ground using a sledgehammer or mallet with a scrap wood block for protection.
Step 3
- Check for level every 6". After 12" the trajectory can no longer be changed.
Step 4
- Drive Pipe Anchor (I) into the ground until you have roughly 18" of pipe above ground.
Step 5
- Slide Post (B) over the installed Pipe Anchor (I).
- Ensure the pipe rests inside the center post channel.
Step 6
- Slide Post Arm (C) down onto the top of Post (B) at a height of 42" from the ground.
- Rotate Post Arm (C) 180° so the channels face downward before seating fully.
Note: Ensure to line up the lip of the post with the notch on the post arm for proper fitment.
Step 7
- Drive (4) 3" Self-Drilling Stainless Steel Screws (K) through Post Arm (C) into Post (B) to secure the arm in place.
Step 8
- Slide Planter Box Brace (H) onto Post (B) with the notch facing down.
Step 9
- Attach (2) Rear Board Walls (D) to the assembly as shown.
Step 10
- Attach Front Board Wall (F) to the planter box assembly as shown.
Step 11
- Slide (2) Side Board Walls (E) into (4) Planter Box Posts (G) as shown.
Step 12
- Using the ⅛" Hardened Steel Bit (L), pre-drill 2 holes through the post and pipe anchor.
Step 13
- Drive (2) ⅝" Tek Screws (J) through the pre-drilled holes to secure the post to the pipe anchor.
Note: You will need to use a 9/32 Hex Shank Bit with your cordless drill to install tek screws. Confirm all connections are secure before proceeding.
Step 14
- Press (5) Post Caps (A) onto the tops of all posts to complete the assembly.
Need Help?
- Email: support@zippity-outdoor.com
- Phone: 704-892-5222 or 877-234-6196
- Text: 980-580-6508