ZP19057
Burbank Vinyl Picket Fence 2-Pack (44" W x 41"H)
ZP19057
Approximate assembly time for 2 panels: 45min.
Click here to watch an installation video
Introduction
General Information
Important Safety Notes:
- Check the inside of the larger pieces in your box for other materials packed inside.
- When assembling components, place on a non-abrasive surface (i.e. shipping box) to avoid scratching.
- We recommend an area approximately 5'x 8' for unobstructed assembling.
- You should not need to use excessive force when assembling components.
Returns:
If you wish to return your product, please contact us first — we can often help resolve the issue right away.
If a return is still necessary, it must be initiated with the retailer where the product was purchased.
Need Help or Replacement Parts?
Although great care has been taken to ensure proper packaging and handling of this product, occasional issues can occur.
If you need replacement parts, assembly assistance, or have questions about the product, our customer service team is ready to help:
- Website: https://parts.nychbrands.com
- Email: support@zippity-outdoor.com
- Phone: 704-892-5222 or 877-234-6196
Customer service agents are available 9am–5pm EST, Monday–Friday.
For Quick Assistance:
- Have reference item number ZP19057
- Provide the specific part name
- Include the batch lot number found on the end of the box
Product Specifications
Detailed Dimensions & Specifications
Product Specifications:
- Overall Height: 41 in
- Overall Width: 44 in
- Ground Stake Depth: 12 in
- Picket Spacing: 2⅜ in
Step 1: Part Identification
A — Post Cap (4)
B — Joiner Clip (4)
C — Post (4)
⅞" x 1½" x 40½"
D — Picket (20)
¼" x 1¼" x 38½"
E — Horizontal Bottom Rail (2)
1½" x 1½" x 44"
F — Horizontal Top Rail (2)
1½" x 1½" x 44"
G — Rail End Cap (8)
(4 installed, 4 loose)
H — ¾" Stainless Steel Screw (28)
I — Post Anchor (4)
¾" x 1¼" x 16"
J — ⅛" Drill Bit
Step 2.1: Identify Rails
- Identify the Horizontal Top Rail (F), and Horizontal Bottom Rail (E) as shown below. Pressure fit (1) loose Rail End Cap (G) into the end of each rail.
Note: Horizontal bottom rails only have picket holes on one side.
Step 2.2: Orient Posts
- Orient (2) Posts (C) with the post tabs facing down. The tabbed posts are the top of your fence.
- Slide (1) Horizontal Top Rail (F) down over the posts until the pre-drilled holes in the posts and top rail align.
- Drive (4) ¾" Stainless Steel Screws (H) into the pre-drilled holes in the horizontal top rail.
Step 2.3: Position Bottom Rail
- Slide Horizontal Bottom Rail (E) over the posts and align the pre-drilled holes.
Step 2.4: Assemble Post Anchors
- Slide the horizontal bottom rail, with picket holes facing towards the top rail, over the posts until the pre-drilled holes align.
- Slide the Post Anchors (I) up the posts until the pre-drilled holes in the anchors align with the pre-drilled holes on the bottom of the posts.
- Drive (2) ¾" Stainless Steel Screws (H) into the pre-drilled holes in the bottom of the posts.
- Drill holes in the post anchor through the (4) pre-drilled holes in the bottom rail using the ⅛" Drill Bit (J).
- Drive (4) ¾" Stainless Steel Screws (H) into the pre-drilled holes in the bottom rail.
Step 3: Insert Fence Pickets
- Rotate the fence panel so the ground stakes face down. Insert (1) Picket (D) into the rails until it locks in the horizontal bottom rail.
- Insert (9) additional pickets into the pre-drilled holes in the rails.
Step 4: Assemble Second Fence Panel
- Repeat steps 2-3 to assemble the second fence panel.
Step 5: Install Fence Into Ground
- Move the fence to its final location and mark the locations of the posts.
- Attempt to push the fence into the ground.
Steps 5.2 - 5.3 only to be completed if ground is too hard for Step 5.1
-
Loosen the top 6" or 7" of the ground with a claw hammer as illustrated.
-
Add water to loosened soil.
-
Use a block of wood to protect the top of post, and gently hammer the post into the ground.
-
If the ground is too hard, you may need to dig a hole large enough to accommodate one post from each panel in the same hole, as shown below.
- Level the screen, backfill excavated dirt, and tamp as necessary.
Step 6: Connect the Fence Panels
NOTE: Use the ⅛" Drill Bit (J) to pre-drill holes in the rails as needed for joiner clip installation.
- Straight Line Application: Fasten screens together with Joiner Clips (B) using (4) ¾" Stainless Steel Screws (H) as illustrated.
- Corner Application: Fasten screens together with Joiner Clips (B) using (4) ¾" Stainless Steel Screws (H) as illustrated.
Step 7: Install Post Caps
- Push the Post Caps (A) down over the posts to lock into place.
Need Help?
- Email: support@zippity-outdoor.com
- Phone: 704-892-5222 or 877-234-6196
- Text: 980-580-6508